Youbang · B2B Custom Silicone Manufacturing · Dongguan

Transferring Silicone Molds to a New Manufacturer

Before the old factory lifts the tool off the press, collect the actual tool and mounting details. These seven checks can tell you whether to schedule a first trial, repair the tool or quote a replacement.

Cost & Tooling EconomicsUpdated

4 min readYoubang Silicone technical editorial team · project parameters require engineering confirmation

Key Sourcing Takeaways

  • Confirm the complete tool envelope and mounting space against the receiving press.
  • Collect a current drawing, approved part and cavity-level defect history before the tool ships.
  • Write the T1 acceptance criteria and identify any repair work before releasing a production order.

Mounting checks for an HCR compression mold

Mounting checks for an HCR compression moldSide view of a steel tool with callouts for lifting, the parting face, vacuum, the lower platen and ejection.Lift points and weightParting face and ventsVacuum portPlaten and clamp positionsEjector travel (if used)
  1. Lift points and weight
  2. Parting face and vents
  3. Vacuum port
  4. Platen and clamp positions
  5. Ejector travel (if used)
Check each interface and the working clearance against the receiving press drawing. Check LSR feed, cold-runner and temperature controls separately.

Match the mold to the actual receiving press

Get the tool's measured length, width, closed height and weight. Ask for photos of each mounting face, all clamps and lifting points, and connections with a reference scale. Compare the approach and handling space with the receiving press. Youbang's HCR compression platens range from 400 × 400 to 650 × 650 mm. Use the actual machine drawing to check working clearance and bolt locations. For LSR, match the feed and cold-runner interfaces, cooling and control details, and any ejection or demolding mechanism.

Seven checks for a silicone mold transfer

Check Ask the outgoing factory for Verify with the receiving factory If something is off
1. Envelope and mounting Overall length, width and closed height, plus clamp and bolt drawings Platen fit, opening and working space, hole positions and loading clearance Review a dimensioned fit drawing and quote any mounting changes before shipping.
2. Tool weight and lifting points Tool weight, centers of gravity if available, and photos of rated lifting points and transport restraints An approved lift and set-down plan using correctly rated equipment and identified lift points Have qualified handling staff resolve missing weight, ratings or unsafe lifting points before moving the tool.
3. Opening travel and ejection Tool opening sequence, ejector pattern and stroke, and any manual demolding steps Enough open clearance, matching pins and a safe stroke for removing the part Agree mechanical changes and validate the complete motion before molding.
4. Vacuum and process connections Vacuum port details, heater and sensor specs, or LSR cold-runner connections and controls Match ports, ratings and control interfaces for the selected HCR or LSR machine Document the required adapters or alteration scope and check connections before trial.
5. Parting face, vents and flash Close-up photos and recent parts showing flash, sticking or filling defects Inspect for crushed or dented shutoffs, wear, blocked vents and previous repairs Record findings and agree whether to clean, repair locally or rework inserts.
6. Drawing revision and cavity history Latest CAD and drawing, approved parts and limit samples, cavity map, compound and process record Match revisions and identify each cavity, material grade and settings to reproduce on T1 Resolve drawing or sample mismatches and hold cavity-specific defects for review.
7. T1 trial after receipt The last approved part and inspection sheet for comparison Mark trial parts by cavity and compare dimensions, appearance and actual use Sign off the sample or quote the correction and schedule another trial.

Decide whether to repair first, run T1 or replace the tool

Repair before testing if inspection finds damage that would prevent safe mounting or closing, or if known defects can be traced to a worn surface or insert. Youbang's in-house five-axis CNC and EDM workshop can review feasible repair work. If the tool fits, the interfaces match and the parting faces are sound, use a controlled first trial to see what the transferred tool actually produces. Compare replacement tooling if the press interfaces need substantial changes or the part revision requires major cavity work.

For silicone baby bibs and placemats, compare each cavity's fastener and catch-pocket opening under the agreed load. Fit the mats to the target tray and check whether the corners lift after washing and drying. Use the old approved part as a comparison and record the trial settings and samples for the next approval decision.

What to send for a transfer review

Send the tool ID, measured envelope and weight, mounting and connection photos, the latest drawing and sample, a short defect list and your desired first-order quantity. Identify who owns the tool and who can authorize pickup. If the old factory still has the press and operators available, collect the latest setup and cavity notes while you can verify them. Request a mold transfer review with what you have.

Sourcing & Tooling FAQ

Key Answers Before Tooling

Covering CAD readiness, 100 pc trial & 1,000 pc / $2,000 USD standard MOQ policy, free 3D fit prototypes vs. T1 silicone samples, NDA protection, and mold ownership.

Have a part-specific question?

Send your drawing or sample photo directly to Youbang’s engineering desk; we send an initial response within 24 hours.

Can you review a transfer if we have no complete mold drawing?

Yes. Start with overall dimensions, closed height, weight, mounting and connection photos, and the last approved part. The receiving team can identify what must be measured before it approves the move.

Do the platen dimensions tell me whether the mold fits?

They are one starting point. Compare tie-bar clearance where applicable, maximum opening, closed height, clamp and bolt positions, ejector travel, utility connections and space for loading.

Can we still use the old test reports after transferring the mold?

Give the lab the existing reports and list changes to material, process, sites, color and construction. Confirm which samples or tests are needed for the applicable market and finished product.

How should we compare repairing the mold with cutting a new one?

Separate inspection, repair, fit modifications, T1 trials and any retesting from the piece price. Ask what the repair can restore, what remains uncertain and who approves further work if T1 exposes another issue.

B2B Factory Direct · initial response within 24 hours

Check the tool before arranging transfer

Send the tool dimensions and weight, photos of the mounting and connections, and the last approved part or drawing.

✓ Trial from 100 pcs · Standard 1,000 pcs or $2,000 USD✓ Free 3D-printed fit prototypes before steel tooling✓ Paid molds 100% owned by customer

Direct Dongguan Engineering Desk

  • Accepts STEP / IGES / PDF / DWG or sample photos
  • New mold T1 typically 7–15 days · Mass run 15–30 days