Youbang · B2B Custom Silicone Manufacturing · Dongguan

Custom Silicone OEM/ODM,
Branding & Production Services

Work directly with our 4,000 m² Dongguan factory (established 2011) from initial CAD or reference samples through Pantone compounding, golden-sample sign-off, and batch-traceable mass production—with a first engineering reply within 24 hours.

Silicone OEM engineering review desk with CAD drawing, matte black, charcoal, translucent and brick-orange molded samples, Shore A durometer and color chips
Silicone OEM engineering review desk with CAD drawing, matte black, charcoal, translucent and brick-orange molded samples, Shore A durometer and color chips

Three Core B2B Service Pillars

End-to-End Engineering Coordination from CAD to Retail-Ready Shipment

Align inputs, in-house vs. partner responsibilities, and golden-sample sign-off gates before cutting steel tooling.

01 · Scope & Tool Ownership

OEM / ODM & Private-Label Customization

Turn 3D/2D CAD drawings, physical benchmark samples, or product briefs into manufacturable LSR injection, HCR compression, or primer-bonded overmolded tooling. We complete DFM review and 3D steel mold design in-house, sign NDAs on request, and guarantee 100% customer ownership on paid molds.

  • Full 3D CAD-to-mold OEM or physical-sample reverse-engineered ODM
  • In-house DFM parting-line review & 3D steel mold design
  • 100% customer ownership on paid molds · NDA available upfront
Explore OEM/ODM cooperation
02 · Pantone, Logo & Packaging

Pantone Color, Logo & Retail Packaging

Match custom Pantone shades on two in-house open mixing mills and run screen printing or soft-touch coating on our shop floor, backed by partnered laser etching and mold cavity texturing. We also coordinate custom color boxes, blister trays, and pouches so part appearance, branding, and retail packaging are approved together.

  • In-house Pantone compounding on 2 mixing mills for multi-SKU ΔE control
  • Mold-in embossed logos, in-house screen printing & soft-touch coating
  • Custom retail boxes, blisters & clean double-PE bags quoted transparently
Review color, logo & packing
03 · T1 Sign-Off & Mass Run

Sampling to Traceable Mass Production

De-risk tooling with 1–3 free 3D-printed geometry prototypes (on clear specs, confirmed quote, and complete drawings; buyer pays shipping), followed by 7–15 day new-mold T1 silicone samples and 15–30 day mass production. Every order runs under ISO 9001 and ISO 13485 controls with ventilated ~200 °C × 4 h post-curing, 2D optical inspection, and lot-to-shipment traceability.

  • 1–3 free 3D-printed geometry samples (when eligible) to verify assembly fit
  • 3–5d existing-mold reference · 7–15d new custom mold T1 silicone sample
  • Signed golden sample + 2D optical FAI report · 15–30d traceable mass runs
See sampling & production gates

Process & Sampling Shortcuts

Comparing molding processes or sample stages first?

B2B Factory Direct · 24h Engineering & Tooling Review

Match our engineering scope to your current project stage

Share your CAD files, reference photos, Pantone targets, or estimated order quantities—General Manager Zhou Li and our engineering team will outline the recommended tooling route and next approval steps within 24 hours.

✓ NDA available before CAD exchange✓ Eligible for 1–3 free 3D fit prototypes✓ Paid molds 100% owned by customer

Direct Dongguan Engineering Desk

  • Accepts STEP / IGES / PDF / DWG or sample photos
  • New mold T1 typically 7–15 days · Mass run 15–30 days
  • Direct Tel / WeChat: +86 185 6655 6911 (Zhou Li)