Youbang · B2B Custom Silicone Manufacturing · Dongguan

Quality Management Systems & Project Compliance Matrix

Review our verified ISO 13485:2016 and ISO 9001:2015 certificate scans alongside a clear 3-layer compliance structure separating factory QMS traceability, raw elastomer CoAs, and third-party finished-part lab testing.

Certificate scans and their scope

Certificate holder: Dongguan Youbang Silicone Products Co., Ltd. (Unified Social Credit Code: 9144190057447159X1). Dates and scopes above match original certificate scans; live registry status and annual surveillance audits can be verified during supplier onboarding. QMS certificates govern factory management systems—finished-device market registrations (such as FDA 510(k) or EU MDR/GPSR) are held by the brand owner.

Three-Layer Compliance Deliverable Package for Your Order

Layer 1 · Raw Elastomer & Masterbatch Dossiers
Batch-matched Certificates of Analysis (CoA), SDS, RoHS/REACH declarations and upstream polymer manufacturer FDA 21 CFR 177.2600, LFGB or USP Class VI / ISO 10993 test summaries matched to your exact compound and color.
Layer 2 · Factory FAI, Batch & Post-Cure Records
First Article Inspection (FAI) 2D optical dimensional sheets, Shore A durometer checks, ~200 °C × 4 h secondary post-cure records and ISO 13485 / ISO 9001 lot traceability logs.
Layer 3 · Accredited Finished-Part Lab Testing (~10 Days)
On project request, we submit molded production-grade samples in your exact pigment and geometry to SGS, Intertek or TÜV for finished-article FDA, LFGB (≤0.5% volatile matter), EN71, EN14350, CPSIA or REACH testing.

Lot-to-Shipment Traceability & Metrology Verification

Local hardness check on a roll-up rack
Local hardness check on a roll-up rack

Critical dimensions, Shore A hardness and cosmetic acceptance criteria are locked in the project inspection plan prior to mass production.

  1. 01

    Incoming Elastomer QC · IQC

    Verify raw silicone grade, supplier batch CoA/SDS (Wacker, Shin-Etsu, Momentive, Dow, Elkem) and customer-supplied insert dimensions before release to mixing.

  2. 02

    In-Process Molding & Post-Cure · IPQC

    Monitor cure temperature, platen/injection parameters, parting-line flash and ventilated ~200 °C × 4 h post-curing logs per production traveler.

  3. 03

    Dimensional & Durometer QC · FQC

    Measure critical datums on our 2D optical vision comparator (typical ±0.05 mm precision capability) and verify Shore A hardness (3 gauges) against signed T1 golden samples.

  4. 04

    Clean Packing & Outgoing Check · OQC

    Execute clean-zone washing/double-PE sealing for personal-care & medical parts, verify carton lot labels and link shipment numbers back to raw material lots.

B2B Factory Direct · 24h Engineering & Tooling Review

Align Your Quality Plan & Market Test Scope Before Tooling

Share your target market (US FDA, EU LFGB/REACH, CPSIA, EN14350 or ISO 10993) and critical inspection datums—our team will map the exact CoA, batch record and lab test deliverables.

✓ NDA available before CAD exchange✓ Eligible for 1–3 free 3D fit prototypes✓ Paid molds 100% owned by customer

Direct Dongguan Engineering Desk

  • Accepts STEP / IGES / PDF / DWG or sample photos
  • New mold T1 typically 7–15 days · Mass run 15–30 days
  • Direct Tel / WeChat: +86 185 6655 6911 (Zhou Li)