Youbang · B2B Custom Silicone Manufacturing · Dongguan

Custom Molded Industrial Silicone Seals & Keypads

Engineer build-to-print gaskets, groove seals, grommets, conductive rubber keymats and P+R control interfaces on our 85T/120T LSR injection and 200–250T HCR compression lines—supporting 0–80 Shore A elastomers (silicone, EPDM, NBR, FKM), typical ±0.05 mm critical fit tolerances, and 2D optical vision inspection.

Custom molded carbon-black, charcoal-gray, brick-red VMQ and translucent silicone gaskets, bellows, O-rings, grommets and umbrella valves
Custom molded carbon-black, charcoal-gray, brick-red VMQ and translucent silicone gaskets, bellows, O-rings, grommets and umbrella valves

Separate the mechanical and control requirements

Sealing and mating surfaces

Begin with the joint and assembly space.

  • Mating drawings and location features
  • Compression space, loads and service media
  • Defined assembly acceptance

Controls and actuation

Begin with the enclosure and control interface.

  • Bezel, PCB and key travel
  • Feel, electrical interface and legends
  • Molded-sample verification
Dimensional measurement equipment
Dimensional measurement equipment

Engineer Parts Around Your Mating Housing & Inspection Plan

Every industrial seal and keypad operates inside an assembly stack—we review critical datum tolerances, flash-free sealing lips, Shore A durometer and 2D optical measurement checkpoints before cutting production steel.

  • Check fit with actual mating components
  • Approve samples to the agreed inspection plan
Manufacturing processes and responsibilities →

B2B Factory Direct · 24h Engineering & Tooling Review

Request Engineering Review for Custom Industrial Parts

Send your 2D/3D CAD (STEP/DXF), Shore A or elastomer spec, mating housing stack and estimated volume—receive DFM feedback within 24 hours.

✓ NDA available before CAD exchange✓ Eligible for 1–3 free 3D fit prototypes✓ Paid molds 100% owned by customer

Direct Dongguan Engineering Desk

  • Accepts STEP / IGES / PDF / DWG or sample photos
  • New mold T1 typically 7–15 days · Mass run 15–30 days
  • Direct Tel / WeChat: +86 185 6655 6911 (Zhou Li)